Sarawak Sea Watch Is Open!
SEA SHIPPINGSARAWAK · NIGHT WATCH

CONTAINER WATCH / 04

Four readings inside the container scope.

Vehicle positioning and securing are separate from a RORO deck movement. Confirm the handling plan first.

Chat on WhatsApp
Alignment
CONTAINER WATCH / 04STATUS / REVIEW

INSTRUMENT ARRAY

Read one panel at a time.

Vehicle positioning and securing are separate from a RORO deck movement. Confirm the handling plan first.

I01READ
Alignment

Alignment

Centre the vehicle within the planned clearance.

INPUT
Vehicle record
STATE
To confirm
I02VERIFY
Positioning

Positioning

Confirm wheel and body clearance before restraint.

INPUT
Vehicle record
STATE
To confirm
I03READ
Restraint

Restraint

Use the agreed securing points and method.

INPUT
Vehicle record
STATE
To confirm
I04VERIFY
Seal

Seal

Record the closure and seal reference where applicable.

INPUT
Vehicle record
STATE
To confirm

CHECK SIGNAL / 04

A practical sequence before release.

  1. 01

    Read the requirement

    Use the current written requirement.

  2. 02

    Match it to the vehicle

    Check the name, unit and route details.

  3. 03

    Verify before handover

    Resolve missing or unclear items early.

  4. 04

    Keep the final record

    Keep the approved copy with the handover file.

BOUNDARY NOTES

What this page can and cannot confirm.

01

Planning guidance

Use these readings to prepare the conversation and handover file.

02

Final record controls

The issued certificate, terminal instruction or approved handling plan remains authoritative.

03

Ask when uncertain

Do not infer an approval, cutoff or cover term from this guide.

REQUIREMENT WATCH

Confirm the live requirement before handover.

Chat on WhatsApp